Skip to content
0

My Cart

Elektryka Morska
  • Company
    • About us
    • Certificates
  • Products
    • Cables
      • Power Cables 0.6/1 KV
      • Comunication Cables 250V
      • Coax and Data Cables
      • Industrial Cables
    • Lighting
      • Lamps
      • Floodlights
      • Searchlights
    • Marine Automation
      • Signal Light Column
      • Nautical Alarm System
      • BAM BNWAS
      • Engine Order Telegraph
      • Telegraph Logger
    • Others
      • Aero Vent Heads
      • Window Wiper
      • Sealing Systems
  • Services
    • Design office
    • Production
    • Supply
    • Repairs & new buildings
    • Automation
    • Hybrid Drives
    • 3D Scanning
    • Electrical calculations and analysis
  • Projects
    • 2024
    • 2023
    • 2022
    • 2021
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
    • 2013
  • News
  • Contact
  • PL
  • EN
  • UE
0

My Cart

2021
Home en
/
Projects
/
2021

Category: 2021

ATLANTIC TWIN
2021, Projects

ATLANTIC TWIN

Installation of the BWTS system and modernization of control consoles. Comprehensive work performed along with the delivery of materials.

więcej
SZARE SZEREGI
2021, Projects

SZARE SZEREGI

Scope of work on the vessel included the removal of damages caused by the fire of one of the generating sets. Following systems were affected by the fire: control switchboards and cables of the generating set engine, generator cables of the neighboring generating set, cable trays in the vicinity of the generating set along with…

więcej
RIO
2021, Projects

RIO

Modernization and start-up of the electrical systems in accommodation area. Replacement of the cables, assembly, delivery and installation of distribution boards. Installation of lighting fixtures, electrical equipment and various types of cables.

więcej
SARDIUS
2021, Projects

SARDIUS

Cabling and connection of the BWMS system including: GPS connection, 400/230/24V power supply and control system connection (valves, sensors, switchboards).

więcej
MOONSTEP
2021, Projects

MOONSTEP

Installation of the new main engine with the SCR system. The works included the removal of the part of the old main engine cables and installation of the new cables to the extent necessary for the proper functioning of the engine. The new ABC engine control system has been integrated into Noris, existing, first generation…

więcej

Posts navigation

1 2 NextNext
Elektryka Morska
  • O nas
  • Ogólne warunki sprzedaży i dostaw
  • Ogólne warunki sprzedaży i dostaw
  • Polityka Prywatności
  • Plan równości płci
  • Kontakt
  • INSTRUKCJA BEZPIECZEŃSTWA PRACY KIEROWCÓW PODCZAS ZAŁADUNKU
Address:ul. Blizińskiego 6, 71-703 Szczecin
Phones:+48 91 852 47 07
  • Facebook
  • LinkedIn
© 2025. Elektryka Morska All Rights Reserved.