TAILWIND PANDA

Electrical installation of the BWTS system during continuous ship operation. Integration of new systems, installation of switchboards, installation of cabling, making connections in accordance with the documentation. Start-up assistance.

MEANDI

Electrical installation of the BWTS system during continuous ship operation. Integration of new systems, installation of switchboards, installation of cabling, making connections in accordance with the documentation. Start-up assistance.

BONTRUP PEARL

Electrical installation of the BWTS system during continuous ship operation. Integration of new systems, installation of switchboards, installation of cabling, making connections in accordance with the documentation. Start-up assistance.

VOHBURG

Electrical installation of the BWTS system during continuous ship operation. Integration of new systems, installation of switchboards, installation of cabling, making connections in accordance with the documentation. Start-up assistance.

CLAUS

Installation of cable routes and transitions, modernization of the main switchboard, installation and connection of cables according to documentation and assistance in commissioning.

MAERSK SHIP SERIES

FFCO (Fast Fuel Change Over) system installation, connection, commissioning and crew training in the operation and use of the system. The project goal was a reduction in the time and amount of fuel needed to complete the change from HSFO (High Sulfur Fuel Oil) to LSFO (Low Sulfur Fuel Oil). Evelyn Maersk, Eleonora Maersk, Marit […]

ATLANTIC MATE

Installation of cable trays and cable penetrations, modernization of the main switchboard, installation and termination of cables according to the documentation and assistance during commissioning.

APACHE II

Electrical installation of the following systems:– HiPAP 502- cabling and connection of the systems,– Seapath 380 – cabling, preparation of the equipment foundations, antenna installation and connection,– ROV- preparation for installations, foundations, modernization of switchboards, connection and start-up.In addition to the works, we have comprehensively supplied the ship with electrical components, electric cables, tools and […]

BONTRUP PEARL

BWTS system installation. Electrical and steel works were performed during the continuous operation of the ship.

ATLANTIC WIND

Modernization of the existing ERMA FIRST’s BWTS electrical installation. The works were carried out under the continuous operation of the ship in the North Sea. We have performed a full range of works, i.e. removal of the existing electrical installation, removal and securing of electrical switchboards and partial removal of cable trays. The installation stage […]

CALISTO

Installation of the BWTS system on the container ship – M/V Calisto. The works included cable trays installation, cabling, as well as installation and connection of electrical switchboards.