
MOSCOW MAERSK
FFCO system installation, connection, commissioning and crew training in the operation and use of the system. The project goal was a reduction in the time and amount of fuel needed to complete the change from HSFO to LSFO.
FFCO system installation, connection, commissioning and crew training in the operation and use of the system. The project goal was a reduction in the time and amount of fuel needed to complete the change from HSFO to LSFO.
The project included a wide range of works aimed at modernizing the RSP-SB 153 and RSP-SB 146 vessels. The key achievements include an original steering gear system, an effective energy distribution system, integration of control systems, modern lighting, regeneration of the navigation panel housings and comprehensive integration with automation systems drive motors. The work also…
Inspection and repair of the power supply system for refrigerated containers.
Electrical work related to the installation of a rotor sail system.