Skip to content
0

My Cart

Elektryka Morska
  • Company
    • About us
    • Certificates
  • Products
    • Cables
      • Power Cables 0.6/1 KV
      • Comunication Cables 250V
      • Coax and Data Cables
      • Industrial Cables
    • Lighting
      • Lamps
      • Floodlights
      • Searchlights
    • Marine Automation
      • Signal Light Column
      • Nautical Alarm System
      • BAM BNWAS
      • Engine Order Telegraph
      • Telegraph Logger
    • Others
      • Aero Vent Heads
      • Window Wiper
      • Sealing Systems
  • Services
    • Design office
    • Production
    • Supply
    • Repairs & new buildings
    • Automation
    • Hybrid Drives
    • 3D Scanning
    • Electrical calculations and analysis
  • Projects
    • 2024
    • 2023
    • 2022
    • 2021
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
    • 2013
  • News
  • Contact
  • PL
  • EN
  • UE
    • Company
      • About us
      • Certificates
    • Products
      • Cables
        • Power Cables 0.6/1 KV
        • Comunication Cables 250V
        • Coax and Data Cables
        • Industrial Cables
      • Lighting
        • Lamps
        • Floodlights
        • Searchlights
      • Marine Automation
        • Signal Light Column
        • Nautical Alarm System
        • BAM BNWAS
        • Engine Order Telegraph
        • Telegraph Logger
      • Others
        • Aero Vent Heads
        • Window Wiper
        • Sealing Systems
    • Services
      • Design office
      • Production
      • Supply
      • Repairs & new buildings
      • Automation
      • Hybrid Drives
      • 3D Scanning
      • Electrical calculations and analysis
    • Projects
      • 2024
      • 2023
      • 2022
      • 2021
      • 2020
      • 2019
      • 2018
      • 2017
      • 2016
      • 2015
      • 2014
      • 2013
    • News
    • Contact
    • ···
0

My Cart

Page 15
Home en
/
Projects
/
Projects
/
Page 15

Category: Projects

Prosna
2017, News, Projects

Prosna

In late March 2017 Elektryka Morska has finished works on cargo ship – Prosna, the ship was modernized in Nauta shipyard.We have performed part of electrical works an electrical elements deliveries.

więcej
Norwegian Joy
2017, News, Projects

Norwegian Joy

In April 2017 we have finished works on passenger ship Norwegian Joy.All works were performed in German shipyard Meyer Werft in Papenburg.

więcej
ORP Orkan
2017, News, Projects

ORP Orkan

In the middle of March an April 2017 we were performing protecting works on naval ship ORP Orkan.All works were performed in Nauta shipyard in Gdynia.

więcej
Edda
2014, Projects

Edda

Realization of the entire electrical installation, locksmith works, connection and start-up of systems. Supply with electrical cables, switchgears, vent check valves, stabilizing elements of exhaust system, lighting systems and other components of specialist apparatus.

więcej
Finest
2014, Projects

Finest

Realization of the entire electrical installation, locksmith works, connection and start-up of systems. Supply with electrical cables, switchgears, vent check valves, stabilizing elements of exhaust system, lighting systems and other components of specialist apparatus.

więcej

Posts navigation

PreviousPrevious 1 … 14 15 16 17 NextNext
Elektryka Morska
  • O nas
  • Ogólne warunki sprzedaży i dostaw
  • Ogólne warunki sprzedaży i dostaw
  • Polityka Prywatności
  • Plan równości płci
  • Kontakt
  • INSTRUKCJA BEZPIECZEŃSTWA PRACY KIEROWCÓW PODCZAS ZAŁADUNKU
Address:ul. Blizińskiego 6, 71-703 Szczecin
Phones:+48 91 852 47 07
  • Facebook
  • LinkedIn
© 2025. Elektryka Morska All Rights Reserved.