Skip to content
0

My Cart

Elektryka Morska
  • Company
    • About us
    • Certificates
  • Products
    • Cables
      • Power Cables 0.6/1 KV
      • Comunication Cables 250V
      • Coax and Data Cables
      • Industrial Cables
    • Lighting
      • Lamps
      • Floodlights
      • Searchlights
    • Marine Automation
      • Signal Light Column
      • Nautical Alarm System
      • BAM BNWAS
      • Engine Order Telegraph
      • Telegraph Logger
    • Others
      • Aero Vent Heads
      • Window Wiper
      • Sealing Systems
  • Services
    • Design office
    • Production
    • Supply
    • Repairs & new buildings
    • Automation
    • Hybrid Drives
    • 3D Scanning
    • Electrical calculations and analysis
  • Projects
    • 2024
    • 2023
    • 2022
    • 2021
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
    • 2013
  • News
  • Contact
  • PL
  • EN
  • UE
    • Company
      • About us
      • Certificates
    • Products
      • Cables
        • Power Cables 0.6/1 KV
        • Comunication Cables 250V
        • Coax and Data Cables
        • Industrial Cables
      • Lighting
        • Lamps
        • Floodlights
        • Searchlights
      • Marine Automation
        • Signal Light Column
        • Nautical Alarm System
        • BAM BNWAS
        • Engine Order Telegraph
        • Telegraph Logger
      • Others
        • Aero Vent Heads
        • Window Wiper
        • Sealing Systems
    • Services
      • Design office
      • Production
      • Supply
      • Repairs & new buildings
      • Automation
      • Hybrid Drives
      • 3D Scanning
      • Electrical calculations and analysis
    • Projects
      • 2024
      • 2023
      • 2022
      • 2021
      • 2020
      • 2019
      • 2018
      • 2017
      • 2016
      • 2015
      • 2014
      • 2013
    • News
    • Contact
    • ···
0

My Cart

Page 3
Home en
/
Projects
/
2022
/
2022
/
Page 3

Category: 2022

ATLANTIC WIND
2022, Projects

ATLANTIC WIND

Modernization of the existing ERMA FIRST's BWTS electrical installation. The works were carried out under the continuous operation of the ship in the North Sea. We have performed a full range of works, i.e. removal of the existing electrical installation, removal and securing of electrical switchboards and partial removal of cable trays. The installation stage…

więcej
CALISTO
2022, Projects

CALISTO

Installation of the BWTS system on the container ship - M/V Calisto. The works included cable trays installation, cabling, as well as installation and connection of electrical switchboards.

więcej

Posts navigation

PreviousPrevious 1 2 3
Elektryka Morska
  • O nas
  • Ogólne warunki sprzedaży i dostaw
  • Ogólne warunki sprzedaży i dostaw
  • Polityka Prywatności
  • Plan równości płci
  • Kontakt
  • INSTRUKCJA BEZPIECZEŃSTWA PRACY KIEROWCÓW PODCZAS ZAŁADUNKU
Address:ul. Blizińskiego 6, 71-703 Szczecin
Phones:+48 91 852 47 07
  • Facebook
  • LinkedIn
© 2025. Elektryka Morska All Rights Reserved.