Skip to content
0

My Cart

Elektryka Morska
  • Company
    • About us
    • Certificates
  • Products
    • Cables
      • Power Cables 0.6/1 KV
      • Comunication Cables 250V
      • Coax and Data Cables
      • Industrial Cables
    • Lighting
      • Lamps
      • Floodlights
      • Searchlights
    • Marine Automation
      • Signal Light Column
      • Nautical Alarm System
      • BAM BNWAS
      • Engine Order Telegraph
      • Telegraph Logger
    • Others
      • Aero Vent Heads
      • Window Wiper
      • Sealing Systems
  • Services
    • Design office
    • Production
    • Supply
    • Repairs & new buildings
    • Automation
    • Hybrid Drives
    • 3D Scanning
    • Electrical calculations and analysis
  • Projects
    • 2024
    • 2023
    • 2022
    • 2021
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
    • 2013
  • News
  • Contact
  • PL
  • EN
  • UE
0

My Cart

2016
Home en
/
Projects
/
2016

Category: 2016

m/v KVALOY
2016, News, Projects

m/v KVALOY

Equipping accommodation and wheelhouse in lighting fixtures, sockets, heating cables and TVSat; delivery and installing external, emergency, navigation lighting, HVAC system, pumps control systems (fuel transport pump, hydrophore pump, firefighting pump, bilge pump), complete connections in engine rooms, 24V charging and distribution system, emergency shutdown, ship management and control system based on PLC and touch…

więcej
m/v ZEUS
2016, News, Projects

m/v ZEUS

In March 2016 we have finished works on tug Zeus. Vessel has been rebuilt after the fire.Elektryka Morska have installed new emergency and accomodation lighting.

więcej
m/v BoDo Constructor
2016, News, Projects

m/v BoDo Constructor

Installation, connection, assembling cabinets and start-up of alarm and monitoring system, production of distribution boards and control cabinets for typhon and compressor, conducting part of electrical works on the vessel. All open deck Ex-proof cable penetrations renewal, replacing of Ex-proof signal cabinets in g2 zone of liquification compresors, renewing cable bands and cable installation, replacing…

więcej
m/v Cap Reinga
2016, News, Projects

m/v Cap Reinga

Installation system of the power supply to the transported containers. Installation of cables and wiring instrumental cabinets and power distribution boxes. Electrical connection of the fans. Minor electrical work.

więcej
m/v Cap Roca
2016, News, Projects

m/v Cap Roca

Installation system of the power supply to the transported containers. Installation of cables and wiring instrumental cabinets and power distribution boxes. Electrical connection of the fans. Minor electrical work.

więcej

Posts navigation

1 2 NextNext
Elektryka Morska
  • O nas
  • Ogólne warunki sprzedaży i dostaw
  • Ogólne warunki sprzedaży i dostaw
  • Polityka Prywatności
  • Plan równości płci
  • Kontakt
  • INSTRUKCJA BEZPIECZEŃSTWA PRACY KIEROWCÓW PODCZAS ZAŁADUNKU
Address:ul. Blizińskiego 6, 71-703 Szczecin
Phones:+48 91 852 47 07
  • Facebook
  • LinkedIn
© 2025. Elektryka Morska All Rights Reserved.