Skip to content
0

My Cart

Elektryka Morska
  • Company
    • About us
    • Certificates
  • Products
    • Cables
      • Power Cables 0.6/1 KV
      • Comunication Cables 250V
      • Coax and Data Cables
      • Industrial Cables
    • Lighting
      • Lamps
      • Floodlights
      • Searchlights
    • Marine Automation
      • Signal Light Column
      • Nautical Alarm System
      • BAM BNWAS
      • Engine Order Telegraph
      • Telegraph Logger
    • Others
      • Aero Vent Heads
      • Window Wiper
      • Sealing Systems
  • Services
    • Design office
    • Production
    • Supply
    • Repairs & new buildings
    • Automation
    • Hybrid Drives
    • 3D Scanning
    • Electrical calculations and analysis
  • Projects
    • 2024
    • 2023
    • 2022
    • 2021
    • 2020
    • 2019
    • 2018
    • 2017
    • 2016
    • 2015
    • 2014
    • 2013
  • News
  • Contact
  • PL
  • EN
  • UE
0

My Cart

Page 6
Home en
/
News
/
News
/
Page 6

Category: News

m/v Mazovia
2016, News, Projects

m/v Mazovia

Iinstallation of medium voltage cable designed to power the entire ship.

więcej
Galaktyka
2016, News, Projects

Galaktyka

Taken overview, measurement and maintenance of the power supply to the unit including the MSR. Legalization of measuring instruments and measurement of battery. Modernization of the safety system of the rudder pumps. Perform electrical work associated with the entire renovation.

więcej
Tassermiut
2017, News, Projects

Tassermiut

Installation and assist of the launch of a new control system of lifts. Disassembly and assembly of electric pumps in various parts of the ship. Execution of inspections, maintenance, and replacement of damaged components in control cabinets pumps. Withdrawal and securing cables in areas where they were provided for welding. Preparing the electrical installation and…

więcej
Alondra
2017, News, Projects

Alondra

In January 2017 we were performing works at ship Alondra. The ship has been rebuilt from container ship to cattle carrier.Elektryka Morska was involved in some of electrical works on Nauta shipyard.

więcej
Bulk Carrier
2017, News, Projects

Bulk Carrier

Elektryka Morska has delivered and installed aft capstan motor on cargo vessel Bulk Carrier.All works has begun in February 2017

więcej

Posts navigation

PreviousPrevious 1 … 5 6 7 8 NextNext
Elektryka Morska
  • O nas
  • Ogólne warunki sprzedaży i dostaw
  • Ogólne warunki sprzedaży i dostaw
  • Polityka Prywatności
  • Plan równości płci
  • Kontakt
  • INSTRUKCJA BEZPIECZEŃSTWA PRACY KIEROWCÓW PODCZAS ZAŁADUNKU
Address:ul. Blizińskiego 6, 71-703 Szczecin
Phones:+48 91 852 47 07
  • Facebook
  • LinkedIn
© 2025. Elektryka Morska All Rights Reserved.