M/V POLONIA

Replacement of main circuit breakers in the 660/230 V main switchboard. Scope of work included removal of existing breakers, transfer of accessories, installation and commissioning of new units, and configuration of protection settings. Functional testing was performed using a dedicated tester (overload, short-time and instantaneous short-circuit protection), followed by issuance of measurement and protection calibration […]
mv Delia

Repair of the PCB for the main engine safety system (NORIS), including functional testing and restoration of full operational capability.
m/v Tony Stark

Comprehensive retrofit of the governor control system. The scope included removal of the existing system, cable inventory and modernization (inspection, replacement and installation of new cable routes), and installation of new control cabinets, consoles, levers, switches, and monitoring equipment. New cable penetrations were installed and cabling was routed between the ECR, wheelhouse (WH), and bridge […]
m/v Wilson Nantes

Installation of cabling for the Eco Drive system, including preparation of the gland plate in the Eco Drive Control Cabin and cable glands in the PCU cabinet. Installation of the control panel in the main bridge console, assembly and sealing of Roxtec cable transits, and routing of additional cabling between the Eco Drive Control Cabin […]