fbpx

m/v ATLANTIC STAR

At the beginning of November we have finished works on Norwegian trawler Atlantic Star. The ship was lenghtened and modernized. The scope of works covered disassembling of old freezing system, steering gear, booster module, installation of the new fish factory equipment, fish factory lighting, cabling of the new alarm and monitoring system. Disassembling of old […]

m/v FANOYVAG

Complete electrical works, supply of all electrical equipment, production and installation of all switchboards for new built vessel (main switchboard, distribution and control switchboards), cabling, electrical equipment installation, lighting supply and installation, alarm system, hydraulics control system.

m/v BRUTUS

Equipping accommodation and wheelhouse in lighting fixtures, sockets, heating cables and TVSat; delivery and installing external, emergency, navigation lighting, HVAC system, pumps control systems (fuel transport pump, hydraulic pump, ballast pump, bilge pump, stand by pump, cooling pump), complete connections in engine rooms, 24V charging and distribution system, ship management and control system based on […]

m/v KVALOY

Equipping accommodation and wheelhouse in lighting fixtures, sockets, heating cables and TVSat; delivery and installing external, emergency, navigation lighting, HVAC system, pumps control systems (fuel transport pump, hydrophore pump, firefighting pump, bilge pump), complete connections in engine rooms, 24V charging and distribution system, emergency shutdown, ship management and control system based on PLC and touch […]

m/v ZEUS

In March 2016 we have finished works on tug Zeus. Vessel has been rebuilt after the fire. Elektryka Morska have installed new emergency and accomodation lighting.

m/v BoDo Constructor

Installation, connection, assembling cabinets and start-up of alarm and monitoring system, production of distribution boards and control cabinets for typhon and compressor, conducting part of electrical works on the vessel. All open deck Ex-proof cable penetrations renewal, replacing of Ex-proof signal cabinets in g2 zone of liquification compresors, renewing cable bands and cable installation, replacing […]

m/v Cap Reinga

Installation system of the power supply to the transported containers. Installation of cables and wiring instrumental cabinets and power distribution boxes. Electrical connection of the fans. Minor electrical work.

m/v Cap Roca

Installation system of the power supply to the transported containers. Installation of cables and wiring instrumental cabinets and power distribution boxes. Electrical connection of the fans. Minor electrical work.

m/v Mazovia

Iinstallation of medium voltage cable designed to power the entire ship.

Galaktyka

Taken overview, measurement and maintenance of the power supply to the unit including the MSR. Legalization of measuring instruments and measurement of battery. Modernization of the safety system of the rudder pumps. Perform electrical work associated with the entire renovation.

Tassermiut

Installation and assist of the launch of a new control system of lifts. Disassembly and assembly of electric pumps in various parts of the ship. Execution of inspections, maintenance, and replacement of damaged components in control cabinets pumps. Withdrawal and securing cables in areas where they were provided for welding. Preparing the electrical installation and […]

Alondra

In January 2017 we were performing works at ship Alondra. The ship has been rebuilt from container ship to cattle carrier. Elektryka Morska was involved in some of electrical works on Nauta shipyard.