fbpx
20240429_123722

CALISTO

Installation of the BWTS system on the container ship – M/V Calisto. The works included cable trays installation, cabling, as well as installation and connection of electrical switchboards.

Related posts

Disassembling of old freezing system, steering gear, booster module, installation of the new fish factory equipment, fish factory lighting, cabling of the new alarm and monitoring system.